Homes and commercial buildings

New construction plumbing

Rough-in and finish plumbing for new builds and commercial fit-outs, worked to the build schedule rather than around it.

Call us when

  • Framing is up and the rough-in needs booking
  • A fit-out with a commercial kitchen, washrooms or an interceptor to install
  • Rough-in that has to pass inspection before anything gets covered
  • An addition, laneway house or basement suite going in
  • The plumber on the job has stopped turning up
A pressure gauge and isolation valves on a supply rough-in beside the drainage stack.
A wall of red PEX supply lines run through the studs, every line clipped straight.
Black ABS drainage set into the floor of a new build before the pour.

What the job involves

  1. Underground and under-slab drainage set before the pour
  2. Supply, drain, waste and vent roughed in and pressure tested
  3. Inspection booked and passed before the walls close
  4. Fixtures, trim and appliances set at finish

Water where it should not be?

Call now. Someone answers, day or night.

(604) 726-2700
Call (604) 726-2700 24/7 emergency service Get a quote